Floor Plan Legend

Desks
Chairs / Stools
Equipment (monitors, amps)
Mic stands / Booms
Storage / Racks
Misc Accessories
Dashed = stored / ceiling

VO Live — 3.22 m × 1.96 m

Primary voice-over recording booth. NW quadrant of zone.

NORTH — Concrete Exterior SOUTH — Partition to Control Room WEST EAST — Buffer BT BT BT BT D3 Obs. Window Mon 1 Mon 2 HP Hooks ×3 HA-400 HDMI PWR Stool Stand PSA1+ Refl. Filter Gobo Booms ×2 Stands ×2

Furniture Schedule — VO Live

Item Model / Specification Qty Location Notes
Talent stool K&M 14047 1 Center of room Height-adjustable; primary recording position
Mic boom arm Rode PSA1+ 1 Desk-clamped, reach to talent position For primary VO mic
Music stand Manhasset M48 1 Adjacent to talent stool Script holder
Headphone amplifier Behringer HA-400 1 North wall shelf, east side Wall-mounted or shelf
Headphone hooks K&M 16085 3 North wall, spaced evenly Wall-mounted
Dubbing monitor 24″ wall-mount display 2 North wall, 150 cm AFF VESA wall-mount brackets
Acoustic reflection filter sE Reflexion Filter Pro 1 Stored against west wall Portable; deploy for close-mic sessions
Acoustic gobo Portable panel 1 Stored against west wall Deploy as needed for dubbing setups
Boom mic stand K&M 21090 2 Stored against west wall For dubbing sessions
Extra music stand Manhasset M48 2 Stored against west wall For dubbing sessions
HDMI receiver + splitter HDMI-over-Cat6 receiver 1 North wall, near monitors Feeds dubbing monitors from Control Room
Power conditioner Furman M-8x2 1 North wall, shelf-mounted Clean power for all booth equipment

Control Room — Trapezoid (N: 261 cm, S: 200 cm, D: 215 cm)

Mixing and monitoring hub. Acoustically optimized trapezoidal geometry.

NORTH (261 cm) — Shared w/ VO Live SOUTH (200 cm) — Front Wall (speaker end) WEST — Corridor EAST — Buffer BT BT BT BT D3 D2 Obs. Window Mixing Desk 1200 × 700 mm — CONTRACTOR-BUILT Chair NF-L NF-R 60° Monitor Triangle DAW Screen I/F TB Mic Patchbay HDMI TX HP ×2 CR-FB ISO pad ISO pad Guest Loveseat 140×70

Furniture Schedule — Control Room

Item Model / Specification Qty Location Notes
Mixing desk Custom build, 1200 × 700 mm 1 38% from front wall (listening position) CONTRACTOR-BUILT; keyboard tray underneath
Engineer chair Herman Miller Aeron 1 Behind mixing desk Size B or C per operator
Near-field monitor Genelec 8040B (or equiv.) 2 On desk, 60° equilateral triangle On IsoAcoustics ISO-155 pads
Monitor isolation pad IsoAcoustics ISO-155 2 Under near-field monitors Decouple from desk surface
DAW screen 27″ display on Ergotron LX arm 1 Center of desk VESA-mount articulating arm
Audio interface Per project spec 1 Desk surface, right side
Patchbay Neutrik / Samson 1 Near east wall, rack or desk-mounted 48-point TRS normalled
Talkback mic Beyerdynamic TG D58c on K&M 23250 1 On desk, left side Gooseneck desk stand
Headphones DT 900 Pro X + DT 770 Pro 2 On hooks near desk One open-back (mixing), one closed-back (tracking)
HDMI-over-Cat6 transmitter HDMI-over-Cat6 TX unit 1 Near desk, sends to VO Live monitors
Floor box CR-FB flush floor box 1 Under desk, flush in floor Power + signal connections
Guest loveseat 140 × 70 cm compact loveseat 1 Against south (rear) wall, centered Between surround speakers (5.1 config); doubles as client seating in stereo mode

Video/Podcast Studio — 5.00 m × 2.36 m

Multi-purpose recording studio. NE quadrant of zone.

NORTH — Exterior SOUTH — Partition / Corridor WEST — Buffer EAST BT BT BT BT D4 SB-02 Green Screen Backdrop — 3.0 m Podcast Table 2000 × 800 mm C1 C2 C3 Boom Arms ×3 HA-400 Camera Rig (facing north) Prompter LED Array (ceiling) CS CS CS CS C-stands ×4 7" Mon Cable Ramp Hooks Amb. Light Amb. Light ST-FB

Furniture Schedule — Video/Podcast Studio

Item Model / Specification Qty Location Notes
Podcast table 2000 × 800 mm, contractor spec 1 Center of room CONTRACTOR-BUILT or procured; cable routing underneath
Podcast chair Ergonomic, low-noise casters 3 Around table (north side) Quiet swivel; no squeaking
Boom arm Rode PSA1+ 3 Desk-clamped to table edge One per seat position
Pop filter Stedman Proscreen XL 3 On boom arms Mounted inline
Headphones DT 770 Pro 80 Ω 3 On hooks / table Closed-back for recording
Headphone amplifier Behringer HA-400 1 On/under table, east end
Camera rig Per production spec 1 South end, facing north Tripod or pedestal mount
LED lighting array Ceiling-mounted LED panels 1 set Ceiling, above table area Dimmable; color-temperature adjustable
Teleprompter Per production spec 1 Near camera position
Green screen backdrop 3.0 m wide retractable 1 North wall, ceiling-mounted rail Retractable when not in use
C-stand Avenger A2030D (or equiv.) 4 Around lighting positions For Godox lights, flags, and reflectors
Camera tripod Per production spec 1 South end, primary camera position Heavy-duty video tripod with fluid head
Field monitor 7″ HDMI on-camera monitor 1 On camera rig or adjacent stand For director / camera operator preview
Cable ramp 2-channel rubber cable protector 2 Floor, between camera and table areas Prevent trip hazards on floor cable runs
Coat hooks Wall-mounted, 4-hook rail 1 Near door D4, south wall For guest jackets / bags
Ambient ceiling light LED panel, dimmable warm/cool 2 Ceiling, away from key light area General room illumination when not recording
Dimmer switch Trailing-edge LED dimmer 1 Near door D4 Controls ambient ceiling lights only (NOT production lights)
Floor box ST-FB flush floor box 1 Far east end, near wall For wide camera position power/signal

Editing Suite — 5.00 m × 1.60 m

Post-production workspace with three editing stations. SE quadrant of zone.

NORTH — Partition to Buffer SOUTH — Exterior Wall WEST EAST D1 D4 Desk 1 Post-Production 1400 × 700 mm — CONTRACTOR-BUILT Desk 2 Graphics / Motion 1400 × 700 mm — CONTRACTOR-BUILT Desk 3 Auxiliary / Render CONTRACTOR-BUILT C1 C2 C3 Dual Monitors Dual Monitors Dual Monitors NAS 12U Rack near ED-P4 cable basket below cable basket below cable basket below

Furniture Schedule — Editing Suite

Item Model / Specification Qty Location Notes
Editing desk ≥1400 × 700 mm each 3 Along south wall: west (post), center (graphics), east (aux) CONTRACTOR-BUILT; cable routing + basket underneath each
Editor chair Ergonomic mesh-back 3 In front of each desk Height-adjustable, quiet casters
Dual monitor arm Ergotron LX Dual 3 One per desk Supports 2× 27″ displays per arm
NAS rack 12U cabinet, acoustic-lined 1 East wall, near ED-P4 outlet Contains NAS, UPS, patch panel; acoustic lining to reduce fan noise
Patch panel 12-port Cat6A 1 Inside NAS rack Keystone panel; all desk runs terminate here
Cable basket Under-desk wire basket 3 Under each desk Cable management; not shown on plan